ARN catering wave
Flight catering demo
Flight demand translated into repeated prep, assembly, pack-out, and dispatch work across one catering day.
Optischedule Demo
Schedule visualization
ARN catering production wave - Mon 4 May
A catering planner needs arriving flight demand turned into timed kitchen and ramp work, with the repeated prep, assembly, pack-out, and dispatch load visible on the actual work cells.
What changed after planning
The scheduler no longer draws sparse flight rows. Rows are the catering teams and cells that repeat work across the day, while Requirements mode shows the demand windows behind each placed block.
- Requirements placed
- 20/20
- Unmet work
- 0
- Locked tasks
- 1
- Warnings
- 1
- Paid hours
- 32h
Requirement bands show work that must be coveredPlanned workLocked anchorWatch item
RequirementPlanned workLocked anchorWatch item2p = two people
09:00 AMMon, May 4
10:00 AMMon, May 4
11:00 AMMon, May 4
12:00 PMMon, May 4
01:00 PMMon, May 4
02:00 PMMon, May 4
03:00 PMMon, May 4
04:00 PMMon, May 4
05:00 PMMon, May 4
06:00 PMMon, May 4
07:00 PMMon, May 4
08:00 PMMon, May 4
09:00 PMMon, May 4
10:00 PMMon, May 4
11:00 PMMon, May 4
12:00 AMTue, May 5
Prep line ACold meal prep5h0
Tray assembly lineTray assembly5.8h0
Pack-out cellCart packing5h0
Dispatch crewRamp handoff5h1Timing risk
Scenario data
| Name | Kind | Status | Updated |
|---|---|---|---|
| Demo coverage day | demo | ready | Jun 25, 2026, 9:30 PM |
| ARN flight-catering wave | flight catering | ready | Jun 25, 2026, 9:30 PM |
| Demo coverage day result | result | completed | Jun 25, 2026, 9:30 PM |
Technical details
- Kind
- DEMO
- Seed dataset
- demo-default
- Reset policy
- manual
- Modules
- flight-catering, schedule-fill, staff-planner