ARN catering wave

Flight catering demo

Flight demand translated into repeated prep, assembly, pack-out, and dispatch work across one catering day.

Optischedule Demo

All demosWorkspace sign-in

Schedule visualization

ARN catering production wave - Mon 4 May

A catering planner needs arriving flight demand turned into timed kitchen and ramp work, with the repeated prep, assembly, pack-out, and dispatch load visible on the actual work cells.

What changed after planning

The scheduler no longer draws sparse flight rows. Rows are the catering teams and cells that repeat work across the day, while Requirements mode shows the demand windows behind each placed block.

Requirements placed
20/20
Unmet work
0
Locked tasks
1
Warnings
1
Paid hours
32h
Requirement bands show work that must be coveredPlanned workLocked anchorWatch item
RequirementPlanned workLocked anchorWatch item2p = two people
09:00 AMMon, May 4
10:00 AMMon, May 4
11:00 AMMon, May 4
12:00 PMMon, May 4
01:00 PMMon, May 4
02:00 PMMon, May 4
03:00 PMMon, May 4
04:00 PMMon, May 4
05:00 PMMon, May 4
06:00 PMMon, May 4
07:00 PMMon, May 4
08:00 PMMon, May 4
09:00 PMMon, May 4
10:00 PMMon, May 4
11:00 PMMon, May 4
12:00 AMTue, May 5
Prep line ACold meal prep5h0
Tray assembly lineTray assembly5.8h0
Pack-out cellCart packing5h0
Dispatch crewRamp handoff5h1Timing risk

Flight types

Short-haul catering

ARN - max 220 pax

4 steps
  1. Pick mealsCatering line - -210 min - 60 min
  2. Assemble traysCatering line - -145 min - 70 min
  3. Pack cartsCatering line - -70 min - 60 min
  4. DispatchDispatch desk - -25 min - 60 min

CSV sample

flightNumber,scheduledAt,pax
SK1401,2026-05-04T10:45:00.000Z,148
SK527,2026-05-04T12:15:00.000Z,172
SK903,2026-05-04T15:40:00.000Z,206