Flight catering demo

Flight demand translated into repeated prep, assembly, pack-out, and dispatch work across one catering day.

Read-only domain example with a recorded schedule and sample app data.

Optischedule Demo

All demosWorkspace sign-in

Flight types

Short-haul catering

ARN - max 220 pax

4 steps
  1. Pick mealsCatering line - -210 min - 60 min
  2. Assemble traysCatering line - -145 min - 60 min
  3. Pack cartsCatering line - -80 min - 60 min
  4. DispatchDispatch desk - -15 min - 15 min

CSV sample

flightNumber,scheduledAt,pax
SK1401,2026-05-04T10:45:00.000Z,148
SK527,2026-05-04T12:15:00.000Z,172
SK903,2026-05-04T15:40:00.000Z,206

ARN catering production wave - Mon 4 May

A catering planner needs arriving flight demand turned into timed kitchen and ramp work, with the repeated prep, assembly, pack-out, and dispatch load visible on the actual work cells.

What changed after planning

The four rows show production cells and the dispatch crew. Their work follows the same handoff sequence for all five flights, with crew requirements shown in Requirements mode.

Requirements placed
20/20
Unmet work
0
Locked tasks
1
Warnings
1
Cell hours
32h

Read-only sample. Switch views and inspect the schedule. Changes and optimizer runs are unavailable in this public demo.

Planned workLocked anchorWatch itemShift spanLunch / coffee2p = two people
09:00 AMMon, May 4
10:00 AMMon, May 4
11:00 AMMon, May 4
12:00 PMMon, May 4
01:00 PMMon, May 4
02:00 PMMon, May 4
03:00 PMMon, May 4
04:00 PMMon, May 4
05:00 PMMon, May 4
06:00 PMMon, May 4
07:00 PMMon, May 4
08:00 PMMon, May 4
09:00 PMMon, May 4
10:00 PMMon, May 4
11:00 PMMon, May 4
12:00 AMTue, May 5
Prep line ACold meal prep8h
Tray assembly lineTray assembly8h
Pack-out cellCart packing8h
Dispatch crewRamp handoff8hTiming risk (1)