Flight catering demo
Flight demand translated into repeated prep, assembly, pack-out, and dispatch work across one catering day.
Read-only domain example with a recorded schedule and sample app data.
Optischedule Demo
ARN catering production wave - Mon 4 May
A catering planner needs arriving flight demand turned into timed kitchen and ramp work, with the repeated prep, assembly, pack-out, and dispatch load visible on the actual work cells.
What changed after planning
The four rows show production cells and the dispatch crew. Their work follows the same handoff sequence for all five flights, with crew requirements shown in Requirements mode.
- Requirements placed
- 20/20
- Unmet work
- 0
- Locked tasks
- 1
- Warnings
- 1
- Cell hours
- 32h
Read-only sample. Switch views and inspect the schedule. Changes and optimizer runs are unavailable in this public demo.
Planned workLocked anchorWatch itemShift spanLunch / coffee2p = two people
Rules
09:00 AMMon, May 4
10:00 AMMon, May 4
11:00 AMMon, May 4
12:00 PMMon, May 4
01:00 PMMon, May 4
02:00 PMMon, May 4
03:00 PMMon, May 4
04:00 PMMon, May 4
05:00 PMMon, May 4
06:00 PMMon, May 4
07:00 PMMon, May 4
08:00 PMMon, May 4
09:00 PMMon, May 4
10:00 PMMon, May 4
11:00 PMMon, May 4
12:00 AMTue, May 5
Prep line ACold meal prep8h
Tray assembly lineTray assembly8h
Pack-out cellCart packing8h
Dispatch crewRamp handoff8hTiming risk (1)
Scenario data
| Name | Kind | Status | Updated |
|---|---|---|---|
| Demo coverage day | demo | ready | Jun 25, 2026, 9:30 PM |
| ARN flight-catering wave | flight catering | ready | Oct 25, 2026, 2:03 PM |
| Demo coverage day result | result | completed | Jun 25, 2026, 9:30 PM |
Technical details
- Kind
- DEMO
- Seed dataset
- demo-default
- Reset policy
- manual
- Modules
- flight-catering, schedule-fill, staff-planner